New 1st Building

New 1st Building

In use since September 2011.
With 108 lesson rooms, 12 large and small ensemble rooms, and orchestra, opera, and chorus studios, this building realizes the highest level of acoustic environments.
Additionally, safety is assured with earthquake-proof construction. Environmental considerations have also been taken, making use of natural energy through solar power, rainwater, and well water.